Southbound manifest with coil steel loads works upgrade through Tunnel #10. Note the new second main track connecting the former sidings of Walong and Marcel. |
Date:
4/25/2018 |
Location:
Walong, CA Map  |
Views:
155 |
Collection Of:

Mike Woodruff |
Locomotives: |
Author: Mike Woodruff
|
 |
Picture Categories: |
This picture is part of album: Tehachapi Action |