CBRY Southbound Copper Ore Train OT-1 has just been loaded at Ray Mine & is bound for Hayden, Az. to be dumped, then will head back to Ray Mine for yet another load of Copper Ore. Trains are loaded & dumped within an hour more or less. I managed to catch 2 loads & 2 empties during daylight. The run between Hayden & Ray Mine is about 15 miles more or less, which is why they can make more than 1 round trip in daylight |