Close to midnight, UP Train ASHAS 18 slowly heads up the main past tied down UP Train MNLAS 18 in Junland Siding with NS Power. The reflection is courtesy of 13 inches of rain in about 18 hours. I don't think anybody has ever seen the ditch that high. Homes across the road were flooded out that had never been flooded out. Thanks to IKE for removing a "speck". |